TOP
Dec 5 2011

We installed the hydrological mechanism today at Seaside Village. We used dipper boxes to evenly distribute the water to 6 separate swales.  Chris Ozyck, Brian Kaye and Alex Felson worked over the weekend to install the hydrology and path systems on site. video by Brian Kaye